|
Accessibility Planning and Local Development. The application
possibilities of the IRAP methodology
The ILO has been promoting for several years a multi-sectoral planning
tool called Integrated Rural Accessibility Planning (IRAP) as an effective
means to reduce the isolation experienced by a great share of the rural
poor. IRAP is concerned with the improvement of the living and working
conditions of rural populations. Its aim is to ensure that available investments
are directed towards the most urgent needs of rural communities, for access
to basic goods, social and economic services and employment opportunities.
This planning tool is intended to be used by local planners and practitioners
and to complement, rather than replace, existing planning practices. It
is currently applied in a number of countries in Africa and Asia where
it is giving encouraging results.
IRAP is an interesting case of analysis on the provision and use of information
in the rural transport planning process. IRAP is a representative example
of the transfer of knowledge from a development organisation to people
working in rural projects in the developing world. On the other hand,
as a methodology, it defines the kind of information needed for its implementation,
therefore, it becomes a source of demand for information for the policy
planning process.
This paper explores the linkages between rural accessibility planning
and the local development process. The paper provides indications concerning
the likely usefulness of the IRAP tool within specific planning contexts.
It also identifies areas for future work to enhance the potential of IRAP.
The paper includes a brief description of the IRAP methodology. It is
presented in seven steps in which the collection of primary and secondary
data is a key input. The data required is categorised into five main groups
of information:
- general socio-economic characteristics of the area;
- location and quality of facilities;
- transport system inventory;
- travel patterns; and
- community priorities.
It is stated that is necessary to train local planners to carry out data
collection as a key activity in the success of this methodology.
| Author: |
Dixon-Fyle, K. |
| Publisher: |
ILO (The International Labour Organisation) |
| Date: |
1998 |
|
Full document:
|
|
|